| 000 | 00986cab a2200241 4500 | ||
|---|---|---|---|
| 001 | WB3421-47 | ||
| 008 | 090401t1998 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u86585 | ||
| 041 | _aeng | ||
| 245 | _aGo-ahead for Channel rail link | ||
| 260 | _c1998 | ||
| 350 | _a0 | ||
| 490 |
_aFinancial Times _v4 June 1998, 1&11(3) |
||
| 520 | _aThe go-ahead has been given for the construction of a high-speed rail link between London and the Channel tunnel. The line which will be built in two stages, will cost £7.7bn and is expected to be completed by 2007. London & Continental Railways are to build the link with financial backing from Railtrack and a total subsidy commitment from the government of between £1.9bn and £2.2bn. Map included. | ||
| 650 | _aCHANNEL RAIL LINK | ||
| 650 | _aEUROSTAR | ||
| 650 | _aFUNDING | ||
| 650 | _aLONDON & CONTINENTAL RAILWAYS | ||
| 650 | _aRAILTRACK | ||
| 690 | _aTRANSPORT AND COMMUNICATIONS | ||
| 942 | _n0 | ||
| 948 | _c04/06/1998 | ||
| 999 |
_c54513 _d54513 |
||