| 000 | 01619cab a2200289 4500 | ||
|---|---|---|---|
| 001 | ABS58876 | ||
| 008 | 090401t1998 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u86939 | ||
| 041 | _aeng | ||
| 245 | _aLorimer and others v Solihull MBC | ||
| 260 | _c1998 | ||
| 350 | _a0 | ||
| 490 |
_aRVR _v(1998) RVR 100-104(5) |
||
| 520 | _aLT 11 August 1997. Owners/occupiers of nos 25, 27, 29 and 60 Widney Lane, Shirley, L and others, sought compensation for certain highway works, involving the construction of a mini roundabout. The claimants found the enjoyment of their properties severely affected and the values diminished. At about the same time as the highway works were undertaken, an order was made prohibiting heavy goods vehicles in excess of 3 tonnes from using the junction. The claim was dismissed on the basis that the difference between the pre and post road works was very limited, if the works had not been carried out it was reasonable to assume that the total traffic would have grown, and it had not been established that the use of the altered junction had caused physical factors which would not otherwise have occurred. | ||
| 650 | _aCOMPENSATION | ||
| 650 | _aKING OTHERS V DORSET CC | ||
| 650 | _aLAND COMPENSATION ACT 1973 PART I | ||
| 650 | _aLORIMER V SOLIHULL MBC | ||
| 650 | _aMINI ROUNDABOUT | ||
| 650 | _aPHYSICAL FACTORS | ||
| 650 | _aREDUCED TRAFFIC FLOW | ||
| 650 | _aROADWORKS | ||
| 650 | _aWILLIAMSON V CUMBRIA CC | ||
| 690 | _aENVIRONMENTAL AND LAND CONSULTANCY-PLANNING AND DEVELOPMENT-COMPULSORY PURCHASE AND COMPENSATION | ||
| 942 | _n0 | ||
| 948 | _c22/06/1998 | ||
| 999 |
_c54749 _d54749 |
||