000 01289cab a2200313 4500
001 ABS58833
008 090401t1998 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u87054
041 _aeng
100 _aHammond, C.G.
245 _aDealing with defects: defective owner provided preliminary design in design-build contracting
260 _c1998
350 _a0
490 _aInternational Construction Law Review
_v15(2) April 1998, 193-210(18)
520 _aConsiders one aspect of dispute avoidance in design-build contracting; the allocation and management of the risk of defects in the preliminary design prepared by the owner or its consultant and included as a part of the owner`s requirements in a competitively-bid, fixed price, design-build contract. Includes case study. References.
650 _aAMERICAN SOCIETY OF CIVIL ENGINEERS
650 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
650 _aCONSTRUCTION DISPUTES
650 _aCONSTRUCTION INDUSTRY INSTITUTE
650 _aDEFECTS
650 _aDESIGN AND BUILD CONTRACTS
650 _aDESIGN-BID-BUILD
650 _aOWNER
650 _aPROJECT SPECIFICATIONS
650 _aRISK ALLOCATION
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c26/06/1998
999 _c54851
_d54851