| 000 | 00807cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS38140 | ||
| 008 | 090401t1987 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u8891 | ||
| 041 | _aeng | ||
| 100 | _aSloan, B. | ||
| 245 | _aWhy make the contractor go bust? | ||
| 260 | _c1987 | ||
| 350 | _a0 | ||
| 490 |
_aArchitect and Surveyor _v62(4) August/September 1987, 16(1) |
||
| 520 | _aDiscusses retention funds on building contracts; attempts to equate the level of retention to the level of risk falling on the client. Covers risk during the contract period, risk during the making good of defects and reducing retention. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 700 | _aRegan, E. | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c5506 _d5506 |
||