245 _aDorset leads the way in new-build thatching
260 _c1998
350 _a0
490 _aCSM
_bChartered Surveyor Monthly
_vJuly/August 1998, 39-41(3)
520 _aReports on the efforts of West dorset building control and the BRE to encourage use of thatch in new-build. Considers the main materials used in thatch and the methods adopted to reduce rik of fire spread, including the introduction of cavities and ventilation below the thatch. Lists the requirements and recommendations of the Dorset model.