| 000 | 00866cab a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS52648 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u88520 | ||
| 041 | _aeng | ||
| 100 | _aPowell-Smith, V. | ||
| 245 | 2 | _aA case of timely importance | |
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v378(6020) 13 April 1995, 14(1) |
||
| 520 | _aExamines "Aries Powerplant Ltd v ECE Systems Ltd" (1995), in which the plaintiff sought to show that time was of the essence in a contract for the supply and installation of diesel tanks. | ||
| 650 | _aCONTRACT | ||
| 650 | _aDAMAGES | ||
| 650 | _aDELAY | ||
| 650 | _aDELIVERY | ||
| 650 | _aHICK V RAYMOND AND REID | ||
| 650 | _aLIABILITY | ||
| 650 | _aTIME OF THE ESSENCE | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c55936 _d55936 |
||