000 00900cab a2200241 4500
001 ABS52651
008 090401t1995 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u88685
041 _aeng
100 _aBingham, T.
245 _aCaught in the breach
260 _c1995
350 _a0
490 _aBuilding
_v260(7889) 21 April 1995, 32(1)
520 _aMuses on "Ruxley Electronics & Contracting Ltd v Stephen Forsyth", which has just been heard in the HL. At issue is whether damages should be awarded for the rebuilding of a swimming pool, which was built smaller than the specification but still useable or whether some amount should be awarded for loss of enjoyment.
650 _aBREACH OF CONTRACT
650 _aCONTRACT CLAIMS
650 _aDAMAGES
650 _aSWIMMING POOLS
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c56068
_d56068