| 245 | _aStrachan and Henshaw Ltd v Stein Industrie (UK) Ltd and another | ||
| 260 | _c1998 | ||
| 350 | _a0 | ||
| 490 |
_aConstruction Law Journal _v[1998] 14 CLJ 370-379(10) |
||
| 520 | _aCA 9 December 1997. Appellants S and G entered into a subcontract with respondent H for construction works, incorporating the MF/1 General Conditions of Contract. S&G had to provide clocking station and cabins for their 150 workmen which they positioned close to the working area. H instructed them to resite these in a compound half a mile away, resulting in increased working time. S&G claimed £1.6m in this respect, raising the issues as to whether the instruction constituted a variation, and whether S&G`s claim was barred by condition 44.4 of MF/1. "Held" no variation occurred, and claim contract barred. | ||
| 650 | _aBREACH OF CONTRACT | ||
| 650 | _aDAMAGES | ||
| 650 | _aMF/1 | ||
| 650 | _aSTRACHAN AND HENSHAW LTD V STEIN INDUSTRIE (UK) LTD AND ANOTHER | ||
| 650 | _aVARIATIONS | ||
| 650 | _aWALKING TIME | ||