000 00675cab a2200205 4500
001 ABS52671
008 090401t1995 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u89938
041 _aeng
245 _aAction stations
260 _c1995
350 _a0
490 _aBuilding
_v260(7887) 7 April 1995, 37-77(34)
520 _aA special feature on the Jubilee Line extension, looking at progress so far, the timing and budget, design, site reports on North Greenwich and London Bridge stations.
650 _aJUBILEE LINE EXTENSION
690 _aBUILDING AND CONSTRUCTION-PROJECTS
690 _aTRANSPORT AND COMMUNICATIONS
942 _n0
948 _c04/03/1997
999 _c56946
_d56946