| 000 | 00675cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS52671 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u89938 | ||
| 041 | _aeng | ||
| 245 | _aAction stations | ||
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v260(7887) 7 April 1995, 37-77(34) |
||
| 520 | _aA special feature on the Jubilee Line extension, looking at progress so far, the timing and budget, design, site reports on North Greenwich and London Bridge stations. | ||
| 650 | _aJUBILEE LINE EXTENSION | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 690 | _aTRANSPORT AND COMMUNICATIONS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c56946 _d56946 |
||