245 _aStansted showcase for Egan`s reforms
260 _c1999
350 _a0
490 _aConstruction News
_v(6597) 7 January 1999, 18(1)
520 _aBAA used the BRE`s Centre for Performance Improvement in Construction to monitor performance on the Stansted Satellite 2 air terminal, which was completed recently. The BRE used its Calibre monitoring system to identify non-productive time, wasted due to shortcomings in design and specification or management failings.