| 000 | 00927cab a2200265 4500 | ||
|---|---|---|---|
| 001 | ABS59894 | ||
| 008 | 090401t1999 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u90868 | ||
| 041 | _aeng | ||
| 100 | _aFerry, J. | ||
| 245 | _aCost study: council-housing block | ||
| 260 | _c1999 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v263(8071) 22 January 1999, 38-43(6) |
||
| 520 | _aA cost analysis of the refurbishment of a 1970s deck-access council-housing block in Hackney, London. Includes details of the client`s brief, a cost commentary, procurement, design, and an elemental analysis of the contract sum. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 | _aCOST ANALYSIS | ||
| 650 | _aCOUNCIL HOUSING | ||
| 650 | _aHACKNEY | ||
| 650 | _aLONDON | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING MAINTENANCE AND REFURBISHMENT | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c22/01/1999 | ||
| 999 |
_c57643 _d57643 |
||