| 000 | 00756cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB3504-03 | ||
| 008 | 090401t1999 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u90908 | ||
| 041 | _aeng | ||
| 245 | _aWhole life-costing yet to become industry practice | ||
| 260 | _c1999 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v263(8071) 22 January 1999, 12(1) |
||
| 520 | _aA BRE survey has shown that of the 900 companies asked, only 25% of them regularly ask for life-cycle costing on new buildings. The survey was commissioned by the DETR. | ||
| 650 | _aBRE | ||
| 650 | _aCONSTRUCTION PROCUREMENT | ||
| 650 | _aLIFE CYCLE COSTING | ||
| 650 | _aWHOLE-LIFE COSTING | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c26/01/1999 | ||
| 999 |
_c57669 _d57669 |
||