000 00544cab a2200181 4500
001 WB2417-03
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u91069
041 _aeng
245 _aEurotunnel beavering away
260 _c1988
350 _a0
490 _aDaily Telegraph
_v29/4/88, p30
520 _aEurotunnel will spend more the £650m this year with the possibility that the Channel Tunnel will open ahead of the target date of May 1993.
690 _aBUILT ENVIRONMENT
942 _n0
948 _c04/03/1997
999 _c57780
_d57780