245 _aRefurbishment costs
260 _c1999
350 _a0
490 _aCSM
_bChartered Surveyor Monthly
_v8 (7) March 1999, 8(1)
520 _aA study by Building Maintenance Information (BMI) shows that refurbishment of existing buildings costs about two-thirds of the equivalent new building. The actual proportion varies according to type of building, from 56% for bank branches to 80% for flats. Table.