000 00772cab a2200229 4500
001 ABS38245
008 090401t1987 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u9494
041 _aeng
100 _aDodd, O.
245 _aMinor Works: a lump sum or fluctuating contract?
260 _c1987
350 _a0
490 _aBuilding Trades Journal
_v194(5726) 8 October 1987, 27(1)
520 _aExamines the effect of deleting clause 4.6 in the absence of optional clause 4.5 in JCT 1980 Minor Works , which provides for limited price fluctuation during a building contract.
650 _aFLUCTUATING CONTRACTS
650 _aLUMP SUM CONTRACTS
650 _aMW80
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
942 _n0
948 _c04/03/1997
999 _c5938
_d5938