_aNew Civil Engineer _v(758) 24 September 1987, 22-24(3) |
||
| 520 | _aDescribes the rapid construction of the prestigious Cascades residential development in London Docklands . Though fast track construction tends to be associated with steel framing, a concrete frame wrapped in traditional brick cavity wall was used in this case. Reviews the difficulties encountered. Photos. | ||