000 00818cab a2200205 4500
001 ABS38254
008 090401t1987 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u9561
041 _aeng
100 _aMontague, S.
245 _aConcrete block in flat out sprint
260 _c1987
350 _a0
490 _aNew Civil Engineer
_v(758) 24 September 1987, 22-24(3)
520 _aDescribes the rapid construction of the prestigious Cascades residential development in London Docklands . Though fast track construction tends to be associated with steel framing, a concrete frame wrapped in traditional brick cavity wall was used in this case. Reviews the difficulties encountered. Photos.
650 _aKENTISH HOMES
690 _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN
942 _n0
948 _c04/03/1997
999 _c5989
_d5989