| 245 | _aEvolution or stagnation | ||
| 260 | _c1997 | ||
| 350 | _a0 | ||
| 490 |
_aConstruction Manager _v3(5) June 1997, 12-13(2) |
||
| 520 | _aLooks at a report produced by the University of Reading Design and Build Forum, on the future of design and build. Considers problems which could hinder the design and build process. | ||
| 650 | _aDESIGN AND BUILD | ||
| 650 | _aFUTURE | ||
| 650 | _aUNIVERSITY OF READING | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||