| 000 | 01044cam a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS61451 | ||
| 008 | 000000n1999 000 0 eng u | ||
| 035 | _a(Sirsi) u100573 | ||
| 100 | _aPheng, L.S. | ||
| 245 | 4 | _aThe application of JIT philosophy to construction: a case study in site layout. | |
| 260 | _c1999 | ||
| 490 |
_aConstruction Management and Economics _v17(5) September 1999, 657-668(12) |
||
| 520 | _aThe just-in-time (JIT) philosophy has been used in the manufacturing industry for about fifty years. Recent case studies in the construction industry have tried to see how JIT can benefit the industry. This study looks at applying JIT principles for site layout to improve productivity and quality to achieve a smoothly running work flow. | ||
| 590 | _aABS | ||
| 650 | _aJUST-IN-TIME | ||
| 650 |
_aCONSTRUCTION MANAGEMENT _96230 |
||
| 650 | _aPRODUCTIVITY | ||
| 650 | _aWASTE MANAGEMENT | ||
| 650 | _aSITE LAYOUT | ||
| 650 | _aQUALITY | ||
| 690 |
_aProject management _96261 |
||
| 700 | _aHui, M.S. | ||
| 942 | _n0 | ||
| 999 |
_c60167 _d60167 |
||