000 00501cam a2200157 4500
001 ABS60899
008 000000n1999 000 0 eng u
035 _a(Sirsi) u101424
245 _aWhole life cost model.
260 _c1999
490 _aBuilding
_v264(8098) 23 July 1999, 72-79(8)
520 _aCompares the whole-life capital and occupancy costs of two Midlands-based call centres and a model building.
650 _aCALL CENTRES
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c60566
_d60566