| 000 | 00501cam a2200157 4500 | ||
|---|---|---|---|
| 001 | ABS60899 | ||
| 008 | 000000n1999 000 0 eng u | ||
| 035 | _a(Sirsi) u101424 | ||
| 245 | _aWhole life cost model. | ||
| 260 | _c1999 | ||
| 490 |
_aBuilding _v264(8098) 23 July 1999, 72-79(8) |
||
| 520 | _aCompares the whole-life capital and occupancy costs of two Midlands-based call centres and a model building. | ||
| 650 | _aCALL CENTRES | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 999 |
_c60566 _d60566 |
||