| 000 | 00699cam a2200157 4500 | ||
|---|---|---|---|
| 001 | ABS60918 | ||
| 008 | 000000n1999 000 0 eng u | ||
| 035 | _a(Sirsi) u101453 | ||
| 100 | _aJaunzens, D. | ||
| 245 | _aTeam talk. | ||
| 260 | _c1999 | ||
| 490 |
_aBuilding Services Journal _vJuly 1999, 37(1) |
||
| 520 | _aDiscusses a new report backed by CIBSE and RIBA which aims to reduce the conflicts between engineers and architects, which often arise during the early stages of a project. The report is entitled Building service design process: the guide for architects and other design professionals and is due to be published in Summer 1999. | ||
| 690 |
_aBlock management _96220 |
||
| 942 | _n0 | ||
| 999 |
_c60590 _d60590 |
||