000 00653cam a2200181 4500
001 ABS61171
008 000000n1999 000 0 eng u
035 _a(Sirsi) u101761
100 _aSchumann, N.
245 2 _aA game of two halves.
260 _c1999
490 _aBuilding
_v64(8102) 3 September 1999, 55(1)
520 _aOutlines the role of the specification writer in design & build projects. They need to both help the bidders understand what the client wants and to ensure that its needs are met within cost and time constraints.
650 _aDESIGN AND BUILD
650 _aSPECIFICATIONS
690 _aBUILT ENVIRONMENT
942 _n0
999 _c60876
_d60876