000 00601cam a2200157 4500
001 WB3530-05
008 000000n1999 000 0 eng u
035 _a(Sirsi) u102058
245 _aSpecialists oppose subcontract.
260 _c1999
490 _aBuilding
_v264(8099) 30 July 1999, 12(1)
520 _aA draft subcontract drawn up as part of the GC/Works suite of documents has been criticised by specialist contractors as placing too much risk on specialists and adding additional cost to the construction process.
650 _aContracts
_96232
690 _aBUILT ENVIRONMENT
942 _n0
999 _c61150
_d61150