000 00599cam a2200157 4500
001 WB3535-01
008 000000n1999 000 0 eng u
035 _a(Sirsi) u102630
245 _aArgent Group's cost savings.
260 _c1999
490 _aContract Journal
_v400(6241) 2 September 1999, 6(1)
520 _aBy adopting the principles of the Egan report, the Argent Group has cut its costs by a third and achieved time savings of 50%. Also looks at how contractor Bovis has implemented some of the Egan principles.
650 _aEGAN REFORMS
690 _aBUILT ENVIRONMENT
942 _n0
999 _c61625
_d61625