000 00667cam a2200193 4500
001 WB3538-01
008 000000n1999 000 0 eng u
035 _a(Sirsi) u102793
245 _aBack to the future.
260 _c1999
490 _aNew Civil Engineer
_v23 September 1999, 9(1)
520 _aDiscusses the relative merits of using the ICE Standard form of Contract, 7th edition, as opposed to the ICE New Engineering Contract, and which is more likely to lead to non-adversarial contracting.
650 _aContracts
_96232
650 _aENGINEERING
650 _aEGAN REFORMS
650 _aLATHAM REFORMS
690 _aBUILT ENVIRONMENT
942 _n0
999 _c61768
_d61768