| 000 | 00727cam a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS61499 | ||
| 008 | 000000n1999 000 0 eng u | ||
| 035 | _a(Sirsi) u102820 | ||
| 100 | _aOllerearnshaw, T. | ||
| 245 | _aValue engineering: not a universal panacea | ||
| 260 | _c1999 | ||
| 490 |
_aCost Engineer _v37(6) November 1999, 8-9(2) |
||
| 520 | _aDiscusses the stages of using value engineering in a project, points out potential pitfalls and suggests ways in which to increase the chances of success. | ||
| 590 | _aABS | ||
| 650 | _aVALUE ENGINEERING | ||
| 650 | _aCONSTRUCTION PROJECTS | ||
| 650 | _aTEAM BUILDING | ||
| 650 | _aCOST PLANNING | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 999 |
_c61793 _d61793 |
||