000 00862cam a2200229 4500
001 ABS62411
008 000000n2000 000 0 eng u
035 _a(Sirsi) u106567
110 _aCitex
_93836
245 _aWhole-life cost model
260 _c2000
490 _aBuilding
_v265(8140) 9 June 2000, 58-61(4)
520 _aLooks at how developers are reducing the whole-life costs of running industrial buildings in order to attract potential tenants. Table of capital, and maintenance costs for a typical 4000msq industrial unit. Case study of Wednesbury One, West Midlands, and Junction Six, Birmingham.
590 _aABS
650 _aINDUSTRIAL BUILDINGS
650 _aWHOLE LIFE COSTS
650 _aCAPITAL COSTS
650 _aMAINTENANCE COSTS
650 _aCOST-EFFECTIVENESS
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c63814
_d63814