000 00878cab a2200229 4500
001 ABS38378
008 090401t1987 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u10170
041 _aeng
100 _aBussell, M.
245 _aFast building in concrete
260 _c1987
350 _a0
490 _aArchitects` Journal
_v186(44) 4 November 1987, 55-63(9)
520 _aSteel-framed building holds more than half the market nationally for medium-rise commercial development, because of significant cost savings through fast construction times. This article describes how by applying the same disciplines of standardisation, simplicity and prefabrication , concrete can be built fast too.
650 _aFAST BUILD
690 _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN
700 _aFitzpatrick, T.
700 _aWhittle, R.
942 _n0
948 _c04/03/1997
999 _c6392
_d6392