000 00975cam a2200241 4500
001 ABS62566
008 000000n2000 000 0 eng u
035 _a(Sirsi) u107281
100 _aMunns, A.
100 _aAl-Haimus, K.
245 _aEstimating using cost significant global cost models
260 _c2000
490 _aConstruction Management and Economics
_v(18) June 2000, 575-585(11)
520 _aPresents a methodology for using the cost significance technique to predict building costs. Produces estimates using the traditional method of producing cost significant models and a refined global cost methodology. Concludes significant improvements are achieved using the new technique. References.
590 _aABS
650 _aBILL OF QUANTITIES
650 _aCOST ESTIMATING
650 _aCOST MODELLING
650 _aCOST SIGNIFICANCE
650 _aBUILT ENVIRONMENT-BUILDING COSTS
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c64142
_d64142