100 _aPowell-Smith, V.
245 _aAlways agree to disagree
260 _c1995
350 _a0
490 _aContract Journal
_v378(6027) 1 June 1995, 18(1)
520 _aConsiders the decision in "Cruden Construction Ltd v Commission for the New Towns" (1994) relating to the validity of two notices of arbitration served by the Commission, as a result of which the RIBA president appointed an arbitrator. At issue was whether there was an existing dispute between the parties when the notices were served.
650 _aJCT 1963 CL 35
650 _aSTRUCTURAL DEFECTS
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS