| 100 | _aPowell-Smith, V. | ||
| 245 | _aAlways agree to disagree | ||
| 260 | _c1995 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v378(6027) 1 June 1995, 18(1) |
||
| 520 | _aConsiders the decision in "Cruden Construction Ltd v Commission for the New Towns" (1994) relating to the validity of two notices of arbitration served by the Commission, as a result of which the RIBA president appointed an arbitrator. At issue was whether there was an existing dispute between the parties when the notices were served. | ||
| 650 | _aJCT 1963 CL 35 | ||
| 650 | _aSTRUCTURAL DEFECTS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||