245 _aAvoiding the effects of an adverse decision
260 _c2000
490 _aContract Journal
_v405(6290) 16 August 2000, 23(1)
520 _aDiscusses the case of "ABB Power Construction Ltd v Norwest Holst Engineering". At issue was the definition of works within the ambit of the Construction Act 1996 s105(2). The court held that the exempt construction operations defined within s105(2) should be defined by reference to the nature of the project as a whole.
590 _aABS
650 _aA B B POWER CONSTRUCTION LTD V NORWEST HOLST ENGINEERING LTD
650 _aHOUSING GRANTS, CONSTRUCTION AND REGENERATION ACT 1996 S105(2)
650 _aEXEMPT CONSTRUCTION WORKS
650 _aDEFINITION
650 _aCONSTRUCTION OPERATIONS
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS