| 245 | _aAvoiding the effects of an adverse decision | ||
| 260 | _c2000 | ||
| 490 |
_aContract Journal _v405(6290) 16 August 2000, 23(1) |
||
| 520 | _aDiscusses the case of "ABB Power Construction Ltd v Norwest Holst Engineering". At issue was the definition of works within the ambit of the Construction Act 1996 s105(2). The court held that the exempt construction operations defined within s105(2) should be defined by reference to the nature of the project as a whole. | ||