| 000 | 00857cam a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS62861 | ||
| 008 | 000000n2000 000 0 eng u | ||
| 035 | _a(Sirsi) u108386 | ||
| 100 | _aBingham, T. | ||
| 245 | _aOut of bounds | ||
| 260 | _c2000 | ||
| 490 |
_aBuilding _v265(8151) 1 September 2000, 63(1) |
||
| 520 | _aExamines the Construction Act 1996 s105(2) 1996 and the problem that certain site works are not covered by it - something that was highlighted by "Norwest Holst Engineering v ABB Power Construction". | ||
| 590 | _aABS | ||
| 650 | _aHOUSING GRANTS, CONSTRUCTION AND REGENERATION ACT 1996 | ||
| 650 | _aHOUSING GRANTS CONSTRUCTION AND REGENERATION ACT 1996 | ||
| 650 | _aABB POWER CONSTRUCTION V NORWEST HOLST ENGINEERING | ||
| 650 | _aSITE WORKS | ||
| 650 | _aEXEMPTIONS | ||
| 690 |
_aDispute resolution _96236 |
||
| 942 | _n0 | ||
| 999 |
_c64716 _d64716 |
||