245 _aIntegrated probabilistic schedules and estimates from project simulated data
260 _c2001
490 _aConstruction Management and Economics
_v19(4) July 2001, 417-426(10)
520 _aSuggests that the risks associated with construction projects can be better quantified by integrating range estimating and probabilistic scheduling, also known as probabilistic estimating and stochastic scheduling, using the empirical cumulative density function technique (ECDF), a graphically based technique which does not require assumptions about the underlying data distributions. Tables, diagrams, references.