| 245 | _aProductivity orientated analysis of design revisions | ||
| 260 | _c2001 | ||
| 490 |
_aConstruction Management and Economics _v19(4) July 2001, 379-391(13) |
||
| 520 | _aPresents a framework to determine the time spent by the design team on design revisions, and their causes, which could be used to assess the productivity of the design phase and as a forecasting tool. When tested using data from 12 construction projects the owner's demands for changes to the design were found to be the most time consuming. Tables, diagrams, references. | ||
| 650 | _aCONSTRUCTION PROJECTS | ||
| 650 | _aDESIGN CHANGE | ||
| 650 | _aDESIGN MANAGEMENT | ||
| 650 | _aDESIGN PROCESS | ||
| 650 | _aDESIGN REVISIONS | ||
| 650 | _aPRODUCTIVITY | ||
| 690 | _aBUILDING AND CONSTRUCTION-MANAGEMENT | ||
| 700 | _aXunzhi, Z. | ||