| 100 | _aStirling, J. | ||
| 245 | _aClobbered from the start | ||
| 260 | _c2001 | ||
| 490 |
_aBuilding _v266(8191) 29 June 2001, 50(1) |
||
| 520 | _aLooks at the problems associated with novation clauses in fixed-price design and build contracts where, as in "Blyth and Blyth v Carillion Construction Ltd", the contractor can suffer losses as a result of the mistakes made by the consultant before the contract was signed. | ||
| 650 | _aBLYTH AND BLYTH V CARILLION CONSTRUCTION LTD | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 650 | _aCONTRACTORS LIABILITY | ||
| 650 | _aDESIGN AND BUILD CONTRACTS | ||
| 650 | _aNOVATION | ||
| 650 | _aNOVATION DESIGN AND BUILD | ||
| 690 | _aBUILDING AND CONSTRUCTION-CASE LAW | ||