000 01366cam a2200265 4500
001 WB3808-14
008 020226n2002 000 0 eng u
035 _a(Sirsi) u116855
245 _aContaminated land planning guidelines
260 _c2002
490 _aPlanning (for the Natural and Built Environment)
_v22 February 2002, 3
490 _aUrban Environment Today
_v(141) 21 February 2002, 3(2)
520 _aDTLR has launched a consultation paper containing guidelines on developing contaminated land. It is part of government's drive to increase the supply of decontaminated land for regeneration and it will replace the sections of PPG23 that deal with contaminated land. The emphasis is on using the planning process to identify the potential for decontaminating land at an early stage. The consultation period ends 15 May 2002. "Development on land affected by contamination: consultation paper on draft planning technical advice" is available from Brian Freeland; t +44(0)20 7944 3856 or email [email protected]
590 _aWB
650 _aCONTAMINATED LAND
650 _aBROWNFIELD SITES
650 _aBROWNFIELD DEVELOPMENT
650 _aLOCAL AUTHORITIES
650 _aPPG23
650 _aPLANNING GUIDANCE
650 _aREGENERATION
650 _aLand use
_96251
690 _aENVIRONMENT-CONTAMINATION
942 _n0
999 _c69597
_d69597