| 000 | 00724cam a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS65095 | ||
| 008 | 020228n2002 000 0 eng u | ||
| 035 | _a(Sirsi) u116913 | ||
| 245 | _aDatafile: Cost model | ||
| 260 | _c2002 | ||
| 490 |
_aBuilding _v267(8221) 15 February 2002, 67-72(6) |
||
| 520 | _aLooks at case studies of recent applications of pre-assembly techniques for pre-fabricated buildings. Deals with principles of pre-assembly and procurement methods for obtaining pre-assembled products. | ||
| 590 | _aABS | ||
| 650 | _aCOST ANALYSIS | ||
| 650 | _aPREFABRICATED BUILDINGS | ||
| 650 | _aPRE-ASSEMBLY | ||
| 650 | _aProcurement-old | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 999 |
_c69645 _d69645 |
||