| 000 | 01149cam a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS65801 | ||
| 008 | 020821n2002 000 0 eng u | ||
| 035 | _a(Sirsi) u119409 | ||
| 100 | _aWright, G | ||
| 245 | _aRunning hot and cold | ||
| 260 | _c2002 | ||
| 490 |
_aBuilding Control _v July/August 2002, 6-7(2) |
||
| 520 | _aSuggests that the construction industry will have to pull the UK into line with the Kyoto initiative. Looks at the Brtish Standards governing hot and cold water pipes insulation as an example of how the construction industry has exploited loopholes in the legislation to avoid complying with environmental controls and how goverment has introduced an updated BS to counteract this. | ||
| 590 | _aABS | ||
| 650 |
_aBUILDING CONTROL _96222 |
||
| 650 | _aINSULATION | ||
| 650 | _aWATER SUPPLIES | ||
| 650 | _aBRITISH STANDARDS | ||
| 650 |
_aEnvironment _96238 |
||
| 650 | _aCONSTRUCTION INDUSTRY | ||
| 650 | _aKYOTO PROTOCOL TO THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE | ||
| 650 | _aBS5422 | ||
| 650 | _aAPPROVED DOCUMENT L | ||
| 690 | _aBUILDING AND CONSTRUCTION-SUSTAINABLE | ||
| 942 | _n0 | ||
| 999 |
_c70989 _d70989 |
||