| 000 | 01286cam a2200217 4500 | ||
|---|---|---|---|
| 001 | WB3913-21 | ||
| 008 | 030401n2003 000 0 eng u | ||
| 035 | _a(Sirsi) u121854 | ||
| 245 | _aTransport: the missing links | ||
| 260 | _c2003 | ||
| 490 |
_aRICS Press Release _v(pr024) 2 April 2003 (2) |
||
| 520 | _aRICS has published a study that reveals many of the 64 transport schemes may not even make the drawing board due to a gap in funding of around £35 billion. The research, "Funding London's transport needs", was carried out by GVA Grimley on RICS' behalf and as well as identifying the shortfalls in the current system, identifies 16 core schemes out of the 64, reducing the costs to £33-39 billion. The study goes on to suggest funding methods to make up the shortfall and examine the wider, regeneration effect of the schemes on London. Contact Kate Ison for copies of the report; t +44 (0)20 7334 3723 or e [email protected]. RICS Press Release http://www.rics.org.uk/ricscms/bin/show?class=PressRelease&template=/includes/showpr.html&id=894&faculty=RICS | ||
| 590 | _aWB | ||
| 650 | _aLONDON | ||
| 650 | _aTRANSPORT PLANNING | ||
| 650 | _aREGENERATION | ||
| 650 | _aRICS RESEARCH | ||
| 650 | _aFUNDING | ||
| 690 | _aTRANSPORT AND COMMUNICATIONS | ||
| 942 | _n0 | ||
| 999 |
_c72412 _d72412 |
||