| 245 | _aThis is a hold-up | ||
| 260 | _c2003 | ||
| 490 |
_aBuilding _v268(8283) 16 May 2003, 56(1) |
||
| 520 | _aSuggests ways of making a claim for losses caused by disruption when proving how much the disruption cost is difficult. Concludes that it can be summarised as the loss of productivity. Recommends the only reliable method of calculation is to calculate and cost each different area of productivity which has been affected by the disruption. | ||
| 590 | _aABS | ||
| 650 | _aDISRUPTION | ||
| 650 | _aLOSSES | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS-STANDARD FORMS OF BUILDING CONTRACT-JOINT CONTRACTS TRIBNUAL CONTRACTS | ||
| 650 | _aPRODUCTIVITY LOSSES | ||