000 01079cam a2200205 4500
001 WB3935-07
008 030917n2003 000 0 eng u
035 _a(Sirsi) u123648
245 _aResearch challenges flood level assumptions
260 _c2003
490 _aNew Civil Engineer
_v(1499) 11 September 2003, 8-9(1)
520 _aResearch by Mott MacDonald has revealed that flood defences in the UK may be significantly underdesigned. Flood levels could rise 0.5m higher than anticipated as assumptions about the characteristics of river channels are oversimplified and underestimate severe floodwater levels such as the 100 year scenario. Meanwhile Norwich Union has developed a 3D map in association with mapping company Nexmap to help assess properties in flood plains on an individual basis, rather than by postcode; thus potentially reducing flood insurance for certain properties.
590 _aWB
650 _aFLOOD DEFENCES
650 _aFLOODING
650 _aWATER LEVELS
650 _aGIS
690 _aENVIRONMENTAL AND LAND CONSULTANCY
942 _n0
999 _c73427
_d73427