| 000 | 00762cab a2200241 4500 | ||
|---|---|---|---|
| 001 | ABS54650 | ||
| 008 | 090401t1996 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u11518 | ||
| 041 | _aeng | ||
| 100 | _aRush, A. | ||
| 245 | _aWorking with confidence | ||
| 260 | _a1996 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v383(6068) 30(1) |
||
| 520 | _aSuggests that wider adoption of the guaranteed maximum price concept and contractors engaging claims consultants on a contingent basis would reduce the need for expensive claim proceedings. | ||
| 650 | _aCONTRACTUAL CLAIMS | ||
| 650 | _aCOSTS | ||
| 650 | _aGUARANTEED MAXIMUM PRICE | ||
| 650 | _aPRICES | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c7344 _d7344 |
||