| 000 | 00673cab a2200241 4500 | ||
|---|---|---|---|
| 001 | ABS54669 | ||
| 008 | 090401t1996 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u11639 | ||
| 041 | _aeng | ||
| 100 | _aHume, I. | ||
| 245 | _aI`m sure that crack is getting worse! | ||
| 260 | _c1996 | ||
| 350 | _a0 | ||
| 490 |
_aContext _v(49) March 1996, 18-19(2) |
||
| 520 | _aFirst in a series of three articles looking at methods of monitoring structural movements. | ||
| 650 | _aCRACKING | ||
| 650 | _aGROUND MOVEMENT | ||
| 650 | _aMONITORING | ||
| 650 | _aSTRUCTURAL MOVEMENT | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING INSPECTION | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c7427 _d7427 |
||