245 _aWhen the chips are down
260 _c2005
490 _aConstruction News
_v13 January 2005, 25(1)
520 _aExamines the long running dispute between Skanska and Egger over the construction of a chipboard factory in Scotland. Argues that the events of this dispute can form the basis of effective advice about future conduct in disputes about contracts. For example, in this case, the contract was not effective for the situation as it was a hybrid one which did not provide any incentives for the contractor. Also the need for mediation had been highlighted as the case was allowed to continue for a long time with many small claims making it very long and expensive to administer.
590 _aABS
650 _aSKANSKA CONSTRUCTION UK LTD V EGGER (BARONY) LTD
650 _aEXPERT WITNESSES
650 _aDESIGN AND BUILD CONTRACTS
650 _aInsurance
_96249
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS