| 000 | 00975cab a2200193 4500 | ||
|---|---|---|---|
| 001 | L129523 | ||
| 008 | 050426n2005 000 0 eng u | ||
| 035 | _a(Sirsi) u129523 | ||
| 041 | _aeng | ||
| 100 | _aLane, Thomas | ||
| 245 | _aWhen disaster strikes | ||
| 260 | _c2005 | ||
| 490 |
_aBuilding _v270(8377) 15 April 2005, 62-64(3) |
||
| 520 | _aExamines "Technical report on major incident and disaster management with particular reference to the recent south Asian tsunami disaster" which warns that rebuilding in response to one type of threat is not desirable. A flexible, integrated approach to disaster management is in fact more preferable. Suggests mapping the areas at risk from future tsunamis and calculating how far a tsunami might go inland. It is also important to make buildings resistant to more than one type of potential disaster. | ||
| 590 | _aIKA290405 | ||
| 650 | _aASIAN TSUNAMI | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 942 | _n0 | ||
| 999 |
_c75148 _d75148 |
||