| 000 | 00784cab a2200181 4500 | ||
|---|---|---|---|
| 001 | L129544 | ||
| 008 | 050428n2005 000 0 eng u | ||
| 035 | _a(Sirsi) u129544 | ||
| 041 | _aeng | ||
| 110 |
_aDavis Langdon _94649 |
||
| 245 | _aCost model | ||
| 260 | _c2005 | ||
| 490 |
_aBuilding _v270(8378) 22 April 2005, 66-73(8) |
||
| 520 | _aLooks at the design and value drivers associated with theatre new-build and refurbishment. Includes the operational considerations and the theatre project costs. With a detailed new-build theatre cost breakdown (including regional variations) based on a scheme which has a 500 seat courtyard style auditorium and associated studio and workshop space. | ||
| 590 | _aIKA290405 | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 999 |
_c75163 _d75163 |
||