000 01387cab a2200181 4500
001 L130080
008 050620n2005 000 0 eng u
035 _a(Sirsi) u130080
041 _aeng
100 _aMitchell, Hamish
245 _aOpening Pandora's box - the method of measurement for Highway Works (MMHW): Part 12 - designed to innovate?
260 _c2005
490 _aCivil Engineering Surveyor
_v June 2005, 30-32(3)
520 _aLooks at the implications of Specification of Highway Works cl106 'design of permanent works by the contractor' and its impact on measurement and the preparation of bills of quantities for structures and structural elements. Describes how recent practice means a specifier no longer stipulates a specific proprietary material, but leaves the choice and design to the contractor. This can result in confusion in the contract. The introduction of "Standard SD 4/92 procedures for the adoption of proprietary structures" meant that brand items could be incorporated into the design where needed. However, this approach has proved to be too open. Concludes this problem might be solved by the inclusion of the words 'or equivalent' when a brand name is used. (See also Abs67770, Abs67769, ABS67964, Abs68163, Abs68280, Abs68473, Abs68677, Abs68871, L129543, L129779)
590 _aIKA040705
690 _aQuantity surveying
_96263
942 _n0
999 _c75445
_d75445