000 00659cab a2200169 4500
001 L130361
008 050721n2005 000 0 eng u
035 _a(Sirsi) u130361
041 _aeng
245 _aDatabank
260 _c2005
490 _aProperty Week
_v70(28) 15 July 2005, 66(1)
520 _aEC Harris figures on the costs of high-quality refurbishments/conversion schemes tendered in the last four years, based on contract sum and updated to current price levels. Short article discusses the particular cost implications of refurbishing existing buildings.
590 _aIKA020805
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c75576
_d75576