| 000 | 00653cab a2200181 4500 | ||
|---|---|---|---|
| 001 | ##L132103 | ||
| 008 | 060110n2006 000 0 eng u | ||
| 035 | _a(Sirsi) u132103 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aWeight, David | |
| 245 | 0 | 0 |
_aDatafile _bwhole-life costs |
| 260 | _c2006 | ||
| 490 | 0 |
_aBuilding _v270(8412) 6 January 2006, 56-60(5) |
|
| 520 | _aExamines the differences in capital, energy, and repair and maintenance costs between a shallow-plan design for a compact school site and a deeper plan with atrium or courtyard. Contains graphs and tables. | ||
| 590 | _aIKA170106 | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 999 |
_c76324 _d76324 |
||