| 000 | 00668cab a2200181 4500 | ||
|---|---|---|---|
| 001 | ##L132558 | ||
| 008 | 060217n2006 000 0 eng u | ||
| 035 | _a(Sirsi) u132558 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aMayer, Peter | |
| 245 | 0 | 0 |
_aSpecifier _bcosts roofing |
| 260 | _c2006 | ||
| 490 | 0 |
_aBuilding _v271(8416) 3 February 2006, 77(1) |
|
| 520 | _aLooks at the whole-life costs for high-performance built-up bitumen covered flat roofs. Discusses durability and key design and workmanship issues. Contains table showing capital cost, net present value and service life years. | ||
| 590 | _aIKA280206 | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 999 |
_c76493 _d76493 |
||