000 00773cab a2200181 4500
001 ##L132776
008 060308n2006 000 0 eng u
035 _a(Sirsi) u132776
041 0 _aeng
100 1 _aRyland, Jane
245 0 0 _aMultiplex's legal position
260 _c2006
490 0 _aBuilding
_v271(8420) 3 March 2006, 60-61(2)
520 _aReports on the problems encountered by Multiplex in the construction of Wembley stadium. Looks at the provisions of the fixed price design-and-construct contract used, which included both incentives for delivering the project on time and within budget, and methods of minimising risk to the employer, Wembley National Stadium Ltd.
590 _aIKA140306
690 _aConstruction management
_96230
942 _n0
999 _c76624
_d76624